Strawbale House

This blog is intended to chart our progress through the self-build process, from half-hearted plot-hunting through to completion of the build. The twist is that we're building the house from timber and straw (hence the blog title).

Click on the image at the end of each post to see that day's photos.

Saturday 29 December 2007

December 29th - Plumbing

I'd arranged to meet farmer Neil on site at 8am to connect the house to the spring water supply. It felt awfully early, and very dark. The connection took only a few minutes, after which I had no excuse to delay any further the testing of the plumbing throughout the house - a task I've been avoiding for many weeks, simply because I didn't think I could take the heartache if it revealed a load of leaks, which would involve pulling floors up or the ceiling down. Of course, the proper time to test it all is BEFORE the ceiling and floors are down, but we didn't have a water supply back then.
It was with considerable trepidation that I hooked up a temporary supply to the first radiator circuit, and little short of outright terror that I turned the water on...
and it was with growing disbelief and relief that I watched for ten minutes, and waited for the tell-tale damp patches to appear on the ceiling. None came.
My test rig didn't include any kind of pressure-release mechanism, and the only way to let the pressure off so I could disconnect my temporary supply pipe was to drill a small hole in the bottom, with a bucket placed strategically underneath, then cut of the drilled section before the next test. I repeated the test for the three remaining circuits, with similarly splendid results. Infact the only slight mishap was when the shower-fitting that Melvin installed a couple of months ago shot a plume of water towards the ceiling and soaked the wall and bathroom floor. I suspect he warned me at the time that he'd only finger-tightened the fittings, with no PTFE tape, but if he did, I'd forgotten long ago. The spill was quickly mopped up and dried, and the leak repaired.
I also did a bit more floor-scraping upstairs and oiled the worktops (again!), before baling out at lunchtime to receive a visiting neice (Camilla).
A huge day. Now that the plumbing has the thumbs-up, I can crack on with the flooring. Bathrooms first - I'll get the vinyl down and have a bash at the installation of basins, dunnies, bath and shower this coming week, hopefully with Melvin's help, before the oak flooring for the rest of the house arrives sometime around the 5th of January.
Aussie Mal's 40th today. Happy birthday from the other side of the world, cocker. Your Scottish legacy is well on track!
291207

1 comment:

Anonymous said...

Hi Damon!

I can't believe you have time to keep this site going when you're doing so much building...

We've just finished a conversion on the other side of Kelso and are about a third of the way through the next one (on the same site) and reading your blog was like reading a diary of our last few years!

You've done such a good job!
Good luck finishing off!!

Emma and Jim