Tuesday 4 December 2007

December 4th - Electrics

A nasty cold, blustery damp day, so I retreated indoors and set about the electrical second fix. The first couple of hours saw all the back-boxes fitted for the ground-floor light-switches and above-counter sockets. The remainder of the day, until I had to leave on a school-run at 2:30 was spent installing and wiring the twelve downstairs light pendants. Just finished the last one in time, which was very satisfying.
Meanwhile, a couple of Scottish Power engineers arrived and joined our 25mm single-phase cable to the big 95mm three-phase cable serving the four plots. They also terminated the cable in the utility room, fitting a 100A fuse on the end of it, in readiness for the meter-installer to come soon. Apparently a couple of years ago all these tasks were carried out by one man, or at least one team in a single visit. Now, in the interests of efficiency, or health and safety, or political correctness, they divide the job into four distinct tasks, each carried out by a separate team, each travelling from Edinburgh in a van (or, today, two vans). It would seem that the soaring cost of domestic energy isn't all down to the price of oil!
Back home I ordered all the sockets, switches etc, which should be here in a couple of days. Quite looking forward to installing it all. It's the one part of the build of which I have any previous experience. Very glad to notice that the wall in Hamish's room, where water had leaked in around the velux unit, has dried out.
Back in Northumberland again tomorrow, working on the day-job.